4.9/5 - (19 votes)

We analysis the entire water evacuation system as originally designed for podium and root cause of failures, if due to design faults, maintenance issues, misuse and then recommend the best solution for podium waterproofing.

METHOD - 1: PODIUM ABOVE WATERPROOFING BY TRIMIX

Remove the existing layer up to slab level and cleaning the entire slab.

METHOD - 2: PODIUM AREA WATERPROOFING BY TRIMIX FINISH WITH STAMPING

Remove the existing layer up to slab level and cleaning the entire slab.

METHOD - 3: PROVIDING AND CARRYING OUT PU GROUTING IN PODIUM

Drill holes as directed of suitable diameter as per the packer selected

Drill holes as directed of correct diameter as per the packer selected

METHOD - 5: PODIUM TOP WATERPROOFING BY NEGATIVE SIDE PU GROUTING

Drill holes as directed of correct diameter as per the packer selected

METHOD - 6: PODIUM TOP WATERPROOFING WITH PU COATING AND RMC ON TOP

Breaking the entire terrace top up to brick bat level

METHOD - 7: WATERPROOFING TO PODIUM GARDEN AREA TOP BY CHEMICAL COATING METHOD WITH ANTI SKID TILE FINISH

Remove the existing Waterproofing layer completely up to the bare concrete with the help of chisel and hammer using chisel at an angle to ensure that the concrete does not get damaged.

podium waterproofing | Avon Projects
podium waterproofing Consultants | Avon Projects

TERRACE TOP WATERPROOFING

METHOD - 1: WATERPROOFING TO TERRACE TOP BY CONVENTIONAL METHOD WITH CHINA MOSAIC TOPPING

Remove the existing Waterproofing layer completely up to the bare concrete.

METHOD - 2: WATERPROOFING TO TERRACE TOP BY CHEMICAL COATING METHOD WITH CHINA MOSAIC TOPPING

Breaking the entire terrace top up to brick bat level

METHOD - 3: TERRACE TOP WATERPROOFING BY DR. FIXIT NEW COAT WITH CHEMICAL COATING METHOD

Check the entire terrace top china mosaic surface thoroughly and loose pockets if any shall be removed and new mortar shall be laid in those areas with IPS finish and false markings no china mosaic shall be laid on these repaired sections

terrace waterproofing consultants | Avon Projects
terrace-waterproofing | Avon Projects
terrace waterproofing | Avon Projects

LMR / OHWT TOP WATERPROOFING

METHOD - 1: TERRACE PARAPET WALL TOP WATERPROOFING WITH CHINA MOSAIC

Provide and lay in place China Mosaic Topping with mixed coloured chips in proper slope as the finishing coat.

METHOD - 2: TERRACE PARAPET WALL TOP WATERPROOFING BY JOINT FILLING IN CUDAPPAH

Open up the joints between cudappah stone on parapet wall, clean and wash the same with water and remove any loose particles, dirt etc.

over head water tank waterproofing | Avon Projects
Building Internal Waterproofing Solutions

LMR / OHWT TOP WATERPROOFING

METHOD - 1: TERRACE PARAPET WALL TOP WATERPROOFING WITH CHINA MOSAIC

Provide and lay in place China Mosaic Topping with mixed coloured chips in proper slope as the finishing coat.

METHOD - 2: TERRACE PARAPET WALL TOP WATERPROOFING BY JOINT FILLING IN CUDAPPAH

Open up the joints between cudappah stone on parapet wall, clean and wash the same with water and remove any loose particles, dirt etc.

podium waterproofing Consultants | Avon Projects
podium waterproofing | Avon Projects

SWIMMING POOL WATERPROOFING

METHOD - 1: SWIMMING POOL BOTTOM AREA WATERPROOFING BY CONVENTIONAL METHOD WITH GLASS MOSAIC TILES

Remove the existing layer completely. Dispose of the removed debris and clean.

METHOD - 2: SWIMMING POOL INTERNAL FLOORING AREA WATERPROOFING

Open the visible cracks of the bare concrete in V groove and fill the cracks with a paste of Approved Polymer, cement.

METHOD - 3: SWIMMING POOL FLOORING AREA GROUTING

Make necessary holes of 12/15 mm in concrete to a depth of about 3” using proper electric hammer drill.

METHOD - 4: SWIMMING POOL INTERNAL WALLS AREA WATERPROOFING

Remove the existing layer completely. Dispose off the removed debris and clean.

podium waterproofing Consultants | Avon Projects
podium waterproofing | Avon Projects
podium waterproofing Consultants | Avon Projects
podium waterproofing | Avon Projects

CHAJJA TOP WATERPROOFING

METHOD - 1: CHAJJA TOP WATERPROOFING BY CONVENTIONAL METHOD

Remove the existing Waterproofing layer completely up to the bare concrete with the help of chisel and hammer using chisel at an angle to ensure that the concrete does not get damaged.

chajja top waterproofing | Avon Projects
chajja top waterproofing | Avon Projects

CORNICE TOP WATERPROOFING

METHOD - 1: CORNICE TOP WATERPROOFING BY CONVENTIONAL METHOD

Remove the existing Waterproofing layer completely up to the bare concrete with the help of chisel and hammer using chisel at an angle to ensure that the concrete does not get damaged.

cornice top waterproofing | Avon Projects
cornice top waterproofing | Avon Projects

CANOPY TOP WATERPROOFING

METHOD - 1: CANOPY TOP WATERPROOFING BY CONVENTIONAL METHOD

Remove the existing Waterproofing layer completely up to the bare concrete with the help of chisel and hammer using chisel at an angle to ensure that the concrete does not get damaged.

canopy top waterproofing | Avon Projects
canopy top waterproofing | Avon Projects

Book a Free Visit

[contact-form-7 id="2348"]
  • Contact Us
    Download Our Profile ! Get Free Visit & Estimation !