Half-Cell Potentiometer Test
• This method may be used to indicate the corrosion activity associated with steel embedded in concrete.
• This method can be applied to members regardless of their size or the depth of concrete cover.
• This method can be used at the any time during the life of concrete member.
• The instrument measures the potential and the electrical resistance between the reinforcement and the surface to evaluate the corrosion activity as well as the actual condition of the cover layer during testing.
• The electrical activity of the steel reinforcement and the concrete leads them to be considered as one half of weak battery cell with the steel acting as one electrode and the concrete as the electrolyte.
• The name half-cell surveying derives from the fact that the one half of the battery cell is considered to be the steel reinforcing bar and the surrounding concrete.
• Then generally readings taken are at grid of 1 x 1 m for slabs, walls and at 0.5 m c/c for Column, beams.
Our Featured Works
SEAWOODS ESTATE Phase-1
(SEAWOOD)
Patel Heritage CHSL
(Kharghar)
Twins Tower
(Kharghar)
Kesar Garden
(Kharghar)
Kesar Harmony
(Kharghar)
Golden Willows
(Mulund West)
Hawa Mahal CHS
(Thane West)
Happy Vally Phase1
(Thane West)
SEAWOODS ESTATE Phase-1
(SEAWOOD)
Patel Heritage CHSL
(Kharghar)
Twins Tower
(Kharghar)
Kesar Garden
(Kharghar)
Kesar Harmony
(Kharghar)
Golden Willows
(Mulund West)
Twins Tower
(Kharghar)
Happy Vally Phase1
(Thane West)
Our Achievments
AVON PROJECTS CONSULTANTS ®
We are a team of experienced Civil Engineers and Architects, and we provide a complete repairs and Rehabilitation solution for various problems based in your Buildings.
Quick links
Structural Auditor
Our Achievments
Have questions, comments or just want to say hello:
- avonprojectscon@gmail.com
-
+91 9967504207
+91 9987244208
- D/12, Plot No. 28, Jay Shree Krishna CHSL, Mhada Colony, Mulund (E) Mumbai - 400081